How to create an in-person or online integration schedule

How to create an in-person or online integration schedule

In this article, you open in-person or online integration classes in BMS Integra so the service provider can choose a date for its employees.

This article also helps if you asked: "how do I open integration dates", "how do I create an online class with an exam", "how do I generate the exam QR Code", "the service provider has no dates to choose".

Who this is for

  • Profile: contracting company (safety analyst or administrator).
  • Access required: permission to create integration schedules.
  • Works on: computer.

Before you start

  • The site must be enabled for integration, and the training syllabus and the exam must already be set up. See How to set up exams and training content.
  • For online integration, first add the training link under Administration > Training Link.
  • Decide the time, capacity and dates. Check everything before saving: dates you create can't be deleted all at once.

Step by step

To create an integration schedule, follow these steps:

  1. In the menu, select Schedules > Integration Schedule > Create.
  2. On the Integration Schedule | New screen, in the Integration Data section, fill in the Unit, the Capacity and the Training Syllabus. Optional: a Description.
  3. In the integration type, click In person or Online.
  4. In Virtual Exam, select the Exam. If the class is Online, also choose the Format (live or recorded), load the link in Link with the load link option, and enter the Training Duration.
  5. In the schedule section, enter the Time.
  6. Select Add Dates for Integration. In the Integration Scheduling window, choose the dates and select Ok. See the section below.
    BMS Integra system screenshot
  7. Check the Schedule Preview and select Save on the form. It is Save that records the schedule.

How to choose the schedule dates

In the Integration Scheduling window (opened by Add Dates for Integration), choose a mode:

  • Doesn't Repeat: a single date. Enter the date and check the Time.
  • Periodic: dates that repeat. Enter Starts in, Ends in, the weekdays in On Days and the number of weeks in Repeat Every. Select Calculate Dates and check the dates generated.
  • Specific Dates: pick any dates you want on the calendar.

In Schedule Preview, the system shows how many schedules will be created. To start over, use Clear Data or Unselect Existing Dates. To confirm the dates and return to the form, select Ok.

Tips for the schedule dates:

  • With Periodic, create the recurrence for about 1 month.
  • Whenever you change the repetition, select Calculate Dates again.

Digital exam and QR Code (in-person integration)

In an in-person integration with an exam in the virtual exam section, the participant takes the exam on a phone:

  1. Under Schedules > Integration Schedule > Search, filter by Unit, Integration Type, Start Date and End Date and select Search.
  2. On the class, under Actions, select Generate Qr Code. The screen shows the QR Code with a message inviting the participant to scan it and take the exam.
  3. Show the QR Code for the participant to scan. To leave, select Back.

Online integration: live or recorded

  • Live: the training takes place by video conference, at the class time.
  • Recorded: the employee watches the recorded training through the class link.
  • The service provider opens the training and the exam under Integration links, within the deadline set in your company's System Configuration. The links only appear for the service provider after the employee's documents are approved. The email with the links is always sent to the people who have access for the service provider.

What happens next

  • The class appears under Schedules > Integration Schedule > Search and, for the service provider, on the site's Integration Schedules calendar. Classes with no vacancies appear in red, as No vacancies.
  • The service provider chooses the date for the employees cleared for scheduling, following your company's rules.
  • In the search results, each schedule has these options under Actions: Edit (future dates only), Delete, Note Release (from the date and time of the class), Generate Attendance List, View Scheduled Employees (when there are scheduled employees), Lista de presença (shown in Portuguese, to upload the signed list, on any type of class), Generate Qr Code and Training Link.

If something goes wrong

  • The dates are wrong: before saving, review the mode and, with Periodic, select Calculate Dates again. After saving, fix each schedule in Search with Edit (future dates only) or Delete, one at a time.
  • You see "Schedule already exists for this unit/date": there is already a class at that site on that date. Choose another date or edit the existing schedule.
  • You see "It is necessary to select a training link.": in an Online integration, load the link with the load link option.
  • The service provider doesn't see dates: check that the class's site is listed under Business Unit(s) allowed for Integration in the company's record and that the date respects the Minimum time for scheduling (in hours) in System Configuration. A full class is still visible to the service provider, in red, as No vacancies.

Still need help?

Contact BMS support: at the top of the system, click Training & Support. The support portal opens in a new tab; there, open a ticket or use the chat. Include:

  • the name of your company and the site;
  • the date and type of the class;
  • what appears on the screen (if you can, send a screenshot).

Related articles:

Reviewed on: 10/20/2026